rkfinch23
Well-Known Member
- Joined
- Dec 20, 2006
- Messages
- 63
- Reaction score
- 0
heres what i have so far........ it's all in the mock up stage now.... i do have a billet frame and 10'' over swingarm that will be done in about a week.. the rear tire is a 145/10. it will be a bike built for testing engine builds. i do have a few motors that are done and waiting 162cc, 185cc, and the 200cc should be done in about 4 weeks..