Ok well after a break from the bikes, i finally got her running again, albeit a little rough. I have to check the valve clearences, very audible tapping noise coming from the head. it currently need a new rear tube, so I'll grab one tomorrow, as well as a #38 and #40 pilot jet.
going to be buying some things for it soon, ultimately going to be upgrading the linkage system. it's a pretty poorly designed part, considering it is expected to withstand alot of wear. even with new bearings, there is alot of play, both sideways and up and down. I think i might be able to put some small washers to act as spacers throughout the linkage pivot points, I'll try that and see how it goes.